rltriumph
Well-Known Member
The first 500-600 would be for a vehicle built in a plant that had a complete retool. The ranger line was retooled prior to the ‘19 model year. Any work being done between model years now will be strictly for maintenance. When a plant is retooled the time frame is short. The subcontractors who design and build the lines with everything involved (robots, cooling lines for tooling and the protective cages) are built offsite and completely disassembled, transported to the assembly plant and put together in a matter of weeks. The lines were run offsite to set up everything and they actually produce a fair amount of vehicles. Some are press vehicles some are display’s and a bunch go right from the temp assembly right to the rail yard.I got ahold of a sales manager on phone, and request assistance from a fleet inventory manager (per some of your recommendations).
They are putting together a contract tonight/tomorrow, after giving me an initial MSRP quote.
1) If I have an X-plan PIN, should I mention this before the contract is sent out, or after it's sent out? Or does it not matter?
(There are a few options on where to get the PIN from, including from a friend who currently works at Ford, and another generous source)
2) On these forums people have suggested avoiding the first 500-600 vehicles of a new model. Given the covid shutdown, would you treat the situation the same as a new model, and wait a bit to order 2021? Or (in your opinion) fine to get an early vehicle? I have the option of ordering tomorrow for the first batch of 2021s.
3) For anyone else considering Costco Auto: they replied that they haven't certified 2021 Ranger yet, and probably won't until early 2021. So I wasn't able to continue with Costco; they were responsive, though.