Jhbryaniv
Well-Known Member
That's a lot of roadside mirrors....Fake optical illusion....all done with mirrors !!!
Sponsored
That's a lot of roadside mirrors....Fake optical illusion....all done with mirrors !!!
Interesting ~10 minutes the water test...
Wonder how my ranger leaked within a week of delivery...
I'm guessing it would seeing as it's so big and no other way to replace it.Interesting Video, thanks Dave.
Two questions, if you need the sunroof replaced does that also require windshield removal? And why do the LED strips look like the dome light cover on an '80s truck?
Every time I see them I'm like, W. T. F.Interesting Video, thanks Dave.
Two questions, if you need the sunroof replaced does that also require windshield removal? And why do the LED strips look like the dome light cover on an '80s truck?
Union pride! Schmuck was late for his smoke break, your truck went in and out.
Any update on the leak?Interesting ~10 minutes the water test...
Wonder how my ranger leaked within a week of delivery...
Just this from yesterday... Silence since... I'm guessing it's a holiday weekend so they aren't working at 100%... I've still got ~10 days before I'm back in florida.Any update on the leak?
They told us we're only going to work 5 days 8 hours. Make about 7 trucks per hour.I like these factory build videos and this one is of the Lightning. There's been a few Ranger ones posted here and it's amazing to see how much things have changed with these new EV's. They now use AGV's to carry the heavier components around the factory like the frames and battery packs.
Thats a heck of an increase and nice to see the demand. Hopefully they can keep with it and these parts constraints get better. Those AGV robots are very impressive and it must be fun seeing all the advancement in technology.They told us we're only going to work 5 days 8 hours. Make about 7 trucks per hour.
I figured I'd wrap up my career at Ford here at the REVC by not working all the long hours... Not.
6 months in they decided to increase production due to demand. We've made 2 additions so far to this place and went from one shift to a 3-crew operation. They're going from 7 jobs per hour to
30 JPH plus. Them AGV robots going to flyin'.