07XLT
Well-Known Member
very coolFinally got my AMP power steps and got them on today. They look and work great. It says 4 to 5 hours. Took me about 10 hours. I’m picky. The boards were the easy part. Wiring was a different story. Being I live in winter wonderland, I spent extra time sealing stuff up, and used some different connectors Inside. I installed lights to frame instead of rocker. Didn’t want to drill holes, and taped lights wouldn’t last long on a rough surface. Also installed the pass thru harness and override switch, which were at extra cost and time.
Sponsored